Disabling and Enabling a Schedule
A schedule can be disabled and enabled from the system. A schedule should be disabled when it is no longer needed for use.
To enable or disable a schedule:
- Click Administration > Schedules in the Left Navigation Pane. The Schedule Administration page displays.
- To enable the schedule,
select
the Enable check box.
To disable the schedule, clear the Enable check box.
Was this helpful?
Please tell us why:
Thank you.